17 bore holes were drilled, soil and ground water samples were taken and analysed on-site and in the laboratory.

Ground water of the studied property is contaminated by TPH and PAH above contamination level (“B” value). Surface projection of the ground water contaminated by TPH above “B” value is 980 m2, above remediation level (“D” value) is 0 m2, the contaminated volume above “B” is 2.744 m3, above “D” is 0 m3. The contaminated volume contains 0,246 kg TPH above “B” and 0 kg TPH above “D” values resp.

Surface projection of the ground water contaminated by PAH above “B” value is 1.033 m2, above remediation level (“D” value) is 0 m2, the contaminated volume above “B” is 2.892 m3, above “D” is 0 m3. The contaminated volume contains 0,001 kg PAH above “B” and 0 kg PAH above “D” values resp.

Soil of the studied property is contaminated by TPH and PAH above contamination level (“B” value), and remediation levele (“D”). Surface projection of the soil contaminated by TPH above “B” value is 1.697 m2, above remediation level (“D” value) is 176 m2, the contaminated volume above “B” is 2.545 m3, above “D” is 141 m3. The contaminated volume contains 5.872 kg TPH above “B” and 479 kg TPH above “D” values resp.

Surface projection of the soil contaminated by PAH above “B” value is 1.375 m2, above remediation level (“D” value) is 24 m2, the contaminated volume above “B” is 2.200 m3, above “D” is 24 m3. The contaminated volume contains 13 kg PAH above “B” and 0,094 kg PAH above “D” values resp.

Surface projection and volume of the soil contaminated by TPH and PAH above “D” value is 200 m2 and 165 m3 resp. based on the calculation of unified isocurves.